Each of the four movements at the top is one JourneyMRO index: a basket of published sources, so no single report moves it. The figure shown is how far the index has moved over the past year.
JourneyMRO Energy Price IndexBrent crude and LNG (Japan import price), US$ monthly averages from the World Bank Pink Sheet, each month at its latest published value. The World Bank estimates the latest two LNG months.Monthly
JourneyMRO Lead Time Days95th-percentile shipping days to site. Route time: sea time from each supplying region (searoute distances at 16 knots, Suez and Panama diversions from IMF PortWatch daily transits) plus 10 days for port, customs and the run inland. Delay: the delay 95% of sailings stay within, estimated from the global share of container ships arriving late and their average delay (Sea-Intelligence). The country figure weights each region by its share of imported oil and gas equipment parts (UN Comtrade, 2025: drilling parts, pump parts, compressor parts, valves and seamless pipe, each weighted equally; for the UAE 2023, its latest year, without seamless pipe, and for the US without compressor parts, which the database didn’t return). {{ ltWSrc }} For Canada, parts from the US arrive by road and rail and are left out, so its figure covers sea-borne supply only; the same goes for US-made parts in the US. For the UAE, ships that can’t pass the Strait of Hormuz (IMF PortWatch daily transits, against the quietest month before the war) land at Khor Fakkan on the east coast; we add a day by road and a week of berth waiting, the wait reported there in August 2026. For the US, US-made parts count for 60%, our estimate: import records don’t show them, but US valve makers’ output (US$34 billion in 2023, BEA via FRED) is close to twice US valve imports, and US firms make most oilfield equipment. Factory backlog quoted in the lane notes: US makers of mining, oil and gas field machinery (Census M3 unfilled orders against shipments, via FRED). No European oil and gas maker publishes a backlog that tracks spares, so Europe is not measured. Context: NOV Energy Equipment orders against orders shipped (quarterly reports). Transshipment and port waiting times are allowances, not measured.Monthly
JourneyMRO Cost of Capital IndexDamodaran sector cost of capital, January 2026 (oil and gas production and exploration, US), moved month to month by the local 10-year government yield, plus Damodaran's country risk for Malaysia, Indonesia and the UAE. The UAE uses the US 10-year yield, since the dirham is pegged to the US dollar. For Malaysia and Indonesia only the yields a year apart are published values (Bank Negara Malaysia, Eastspring; Bank Indonesia, Bareksa); the months between are drawn in a straight line.Monthly
JourneyMRO Spares Price IndexMaker prices from each supplying region, weighted by where the country's parts come from (the same import shares as lead times; other origins at the average). US: BLS producer prices for oil and gas field machinery. Europe: Eurostat producer prices for pumps and compressors (EU27). China: NBS producer prices for general-purpose machinery, a stand-in. Japan: Bank of Japan producer prices for production machinery, a stand-in. Converted at three-month average exchange rates, since price lists lag the currency. Factory-gate prices: freight, duty and distributor margin are not included. Compared against national CPI. Weights as for lead times. {{ ltWSrc }}Quarterly
Gas prices in the stripHenry Hub and European gas (TTF), World Bank Pink Sheet; context only, not used in any index.Monthly
Downtime costProduct price (as the Energy Price Index) and exchange rates from central bank reference rates. Gross value: government take (PRRT, royalties, production sharing, concessions) is not deducted, since it depends on each field’s terms. Typical sizes: crude oil 20, 60 and 150 thousand barrels a day while running; LNG 2, 5 and 10 million tonnes a year (1 tonne of LNG is about 52 MMBtu), made on 92% of the year’s days. No site figures are used.Monthly
Direction of buffersStandard safety-stock logic: the buffer worth holding grows with the service level’s z-score and with the square root of the lead time. The service level is not set; it falls out of the balance between the cost of running short (a lost day, which moves with the product price) and the cost of holding (the cost of capital plus 4% a year for storage, insurance and handling, times the spares price). We start from an average 95% service level a year ago and let the four drivers move it. The dial shows the change in the buffer: within 3% either way counts as no bias.Monthly
Consumer pricesNational CPI, shown beside spares prices for comparison. Australia: based on ABS data. Canada: Statistics Canada. US: BLS via FRED. Malaysia: Department of Statistics Malaysia (data.gov.my). Indonesia: BPS; four points are published values (the September and August 2026 index, and September and December 2025 backed out of the published year-on-year and year-to-date rates), and the months between are drawn in a straight line. UAE: Dubai consumer prices (Dubai Data and Statistics Establishment), a stand-in for the country; the year’s change to September 2026 and September’s monthly change are published values, and the months between are drawn in a straight line.Monthly