How much stock a mine should hold depends on four things it doesn’t control: the price of what it digs up, the cost of money, the wait for parts and the price of those parts. This page tracks all four. It shows which way they push, never how much to hold.
A spare on the shelf is an insurance policy against a stopped mine, and over the past year that policy became worth more. Most of what mines dig up rose in price, copper by nearly half and coal by about a third, so a lost day costs more.
The replacement also takes longer to arrive. Ships run later than they did, and equipment makers have more unbuilt orders. Money costs a little more to tie up.
The pull isn’t the same everywhere. Copper and coal lift the buffer worth holding the most. For iron ore, the lower price roughly cancels the slower ships. See the selections below for a detailed analysis relevant to your operation.
I run {{ sayArt }} operation in , reported in .
This edition{{ hook }}
{{ recHead }}
{{ recBal }}
{{ recWhere }}
Why it matters{{ why1 }}
{{ dtIntro }}
{{ royText }}
Why it matters{{ why2 }}
{{ ltText }}
Why it matters{{ why3 }}
{{ capText }}
Capital is only part of what stock costs to hold. Storage, insurance, handling and shrinkage add to it. The largest for slow-moving spares, and the least counted, is obsolescence: the part that outlives the machine it was bought for. A critical spare can sit for years, then be worth nothing the day its equipment is retired.
Why it matters{{ why4 }}
{{ spText }}
{{ spChina }}
Each of the four movements is a JourneyMRO index: a basket of published sources, so no single report moves it. Commodity prices come from the IMF and the World Bank; cost of capital from Damodaran and government bond yields; lead times from shipping routes and factory backlogs; spares prices from makers in each supplying region. Data runs to September 2026.
Each of the four movements at the top is one JourneyMRO index: a basket of published sources, so no single report moves it. The figure shown is how far the index has moved over the past year.
Every figure is tagged by where it came from: published, derived, JourneyMRO experience, or assumption. Index and projection weights and the typical-operation parameters are ours and are published with the method note.
Subscribed. The next piece will arrive in your inbox.
That didn’t send. Please try again.
Get each new piece by email when it’s published. Nothing else.
Thanks. Your feedback has been sent.